| Rube Allyn-sand Key Bridge |
| One Of Four Loads Of Sand Key Bridge, Non Grant, 70000 Tons Total |
| County: Pinellas |
| Deployed: 12/31/1996 |
| Type: Bridge |
 |
 |
 |
| St. Petersburg Bay Reef |
| Portions Of Gandy Bridge, Boat Hulls And Concrete Debris |
| County: Pinellas |
| Deployed: 12/31/1995 |
| Type: Bridge |
 |
 |
 |
| North County Reef (center) |
| Steel Barge 150x45x10h, Upright, South Of The Other Two |
| County: Pinellas |
| Deployed: 8/31/1999 |
| Type: Barge |
 |
 |
 |
| Rube Allyn North |
| One 30'lx 15'w X 13'h Barge |
| County: Pinellas |
| Deployed: 6/9/1999 |
| Type: Barge |
 |
 |
 |
| Veterans Reef |
| 180' X 30' X 10' Barge With P2v-3 Bomber Cabled To It |
| County: Pinellas |
| Deployed: 7/2/2000 |
| Type: Barge |
 |
 |
 |
| Veterans Reef (center) |
| Steel Barge, Upright, 14 Feet East Of 8-2-99 Barge |
| County: Pinellas |
| Deployed: 8/4/1999 |
| Type: Barge |
 |
 |
 |
| Clearwater Reef |
| 37 X 18 X 8 Fiberglass Boat Mold, 15 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 6/1/1983 |
| Type: Other |
 |
 |
 |
| Clearwater Reef |
| 33 X 12 X 3 Fiberglass Boat Mold, 20 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 6/1/1983 |
| Type: Other |
 |
 |
 |
| Dunedin |
| 4th Of 5 Loads This Grant This Site |
| County: Pinellas |
| Deployed: 5/28/1985 |
| Type: Other |
 |
 |
 |
| Indian Shores Reef |
| 2 Boat Molds Secured Together And Laying On Starboard Side |
| County: Pinellas |
| Deployed: 7/9/1985 |
| Type: Other |
 |
 |
 |
| North County Reef (ne)-a |
| Tetrahedrons 40'x32'x18'h, 270 Ft. Ne Of Barges |
| County: Pinellas |
| Deployed: 9/1/1999 |
| Type: Other |
 |
 |
 |
| Pinellas Ii |
| Boat Mold Adjacent To Tires |
| County: Pinellas |
| Deployed: 5/29/1985 |
| Type: Other |
 |
 |
 |
| Rube Allyn |
| 2 Loads From 5/17/83 To 6/7/83, Fiberglass Boat Molds |
| County: Pinellas |
| Deployed: 6/7/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| Fiberglass Boat Molds 300 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 12/20/1982 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 3 Molds, 15x8x1, 50x16x8, 25x10x2 |
| County: Pinellas |
| Deployed: 6/1/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 50 X 10 X 3 Feet Fiberglass Boat Molds |
| County: Pinellas |
| Deployed: 5/19/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 2- 41x18x8, 1- 33x12x3, 1- 41x18x3, 100 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 6/1/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 50 X 12 X 4 Feet, 2 Units, 75 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 5/24/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 37 X 8 X 4 Fiberglass Boat Molds |
| County: Pinellas |
| Deployed: 5/11/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 30 X 10 X 3 Feet Fiberglass Boat Molds |
| County: Pinellas |
| Deployed: 5/12/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 37 X 8 X 4 Feet Fiberglass Boat Molds |
| County: Pinellas |
| Deployed: 5/18/1983 |
| Type: Other |
 |
 |
 |
| Rube Allyn Reef |
| 50 X 15 X 10 Feet Fiberglass Boat Molds (3) |
| County: Pinellas |
| Deployed: 5/26/1983 |
| Type: Other |
 |
 |
 |
| Tarpon Springs Reef |
| Fiberglass Boat Molds, 350 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 12/9/1982 |
| Type: Other |
 |
 |
 |
| Tarpon Springs Reef |
| Fiberglass Boat Molds, 350 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 12/14/1982 |
| Type: Other |
 |
 |
 |
| Veterans Reef |
| 2 Small Steel Cargo Boxes And 2 Rubble Boxes |
| County: Pinellas |
| Deployed: 11/16/2000 |
| Type: Steel Scrap |
 |
 |
 |
| Veterans Reef |
| Need |
| County: Pinellas |
| Deployed: 9/11/2000 |
| Type: Steel Scrap |
 |
 |
 |
| Veterans Reef |
| 2 Cargo Boxes 7.5' H X 22'l X 8' W |
| County: Pinellas |
| Deployed: 1/29/2000 |
| Type: Steel Scrap |
 |
 |
 |
| Veterans Reef |
| 2 Steel Cargo Boxes (roll-off Containers) |
| County: Pinellas |
| Deployed: 1/26/2000 |
| Type: Steel Scrap |
 |
 |
 |
| Veterans Reef |
| 1 Large, 1 Small Steel Cargo Boxes With 4 Pieces 24" X 4' Culvert |
| County: Pinellas |
| Deployed: 1/17/2000 |
| Type: Steel Scrap |
 |
 |
 |
| Indian Shores Reef Site |
| 2 Loads Form 1/5/83 To 6/23/83, Three Other Sites, Same Grant |
| County: Pinellas |
| Deployed: 6/28/1983 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Extreme Scattering Due To Storm |
| County: Pinellas |
| Deployed: 7/22/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Good Small Patch |
| County: Pinellas |
| Deployed: 6/11/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Compact Configuration With About 10 Foot Profile |
| County: Pinellas |
| Deployed: 7/24/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Near Older Tire Units |
| County: Pinellas |
| Deployed: 7/17/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Near Older Tire Units |
| County: Pinellas |
| Deployed: 7/2/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Large Bait Fish School Adjacent To Tires |
| County: Pinellas |
| Deployed: 6/25/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Tight But Unstable Patch, 17 Foot Profile |
| County: Pinellas |
| Deployed: 6/4/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Highly Scattered Due To Rough Seas |
| County: Pinellas |
| Deployed: 5/22/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Two Piles 30 Feet Apart, 15 Foot Profile |
| County: Pinellas |
| Deployed: 5/21/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Highly Scattered Due To Rough Seas |
| County: Pinellas |
| Deployed: 5/8/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Scattered About The Bottom, Minimum Profile |
| County: Pinellas |
| Deployed: 5/2/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Tires Placed In Tight Patch, 15 Foot Profile |
| County: Pinellas |
| Deployed: 4/30/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii |
| Tires Placed In Tight Patch, 15 Foot Profile |
| County: Pinellas |
| Deployed: 4/23/1985 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii Reef |
| Tire Units, 175 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 4/26/1983 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii Reef |
| Compacted Tire Units, 150 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 4/13/1983 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii Reef |
| Banded Split Tire Units, 100 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 6/21/1983 |
| Type: Tires |
 |
 |
 |
| Pinellas Ii Reef |
| Compacted Tire Units, 80 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 6/23/1983 |
| Type: Tires |
 |
 |
 |
| Rube Allyn Reef |
| Compacted Tire Units, 650 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 4/27/1983 |
| Type: Tires |
 |
 |
 |
| Rube Allyn Reef |
| Compacted Tire Units, 600 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 2/1/1983 |
| Type: Tires |
 |
 |
 |
| Rube Allyn Reef |
| 1000 Square Feet Of Coverage |
| County: Pinellas |
| Deployed: 9/17/1982 |
| Type: Tires |
 |
 |
 |
| Rube Allyn Reef |
| Compacted Tire Units, 500 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 2/17/1983 |
| Type: Tires |
 |
 |
 |
| Rube Allyn Reef |
| 1000 Square Feet Of Coverage |
| County: Pinellas |
| Deployed: 9/9/1982 |
| Type: Tires |
 |
 |
 |
| Rube Allyn Reef |
| Compacted Tires Units, 1240 Sq. Feet |
| County: Pinellas |
| Deployed: 8/31/1982 |
| Type: Tires |
 |
 |
 |
| Rube Allyn Reef |
| Compacted Tire Units, 176 Pieces, 30 Tons, 1550 Sq. Feet |
| County: Pinellas |
| Deployed: 8/30/1982 |
| Type: Tires |
 |
 |
 |
| Clearwater C Site |
| 25 Pieces Of Concrete 12 To 52 Inch Sizes |
| County: Pinellas |
| Deployed: 7/7/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| Area Covered 29' X 45', 9 Pieces |
| County: Pinellas |
| Deployed: 4/12/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| 46 Pieces Of Culverts And Boxes |
| County: Pinellas |
| Deployed: 3/17/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| 30 Pieces Of Concrete 18 To 24 Inch Ovals |
| County: Pinellas |
| Deployed: 7/26/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| 17 Pieces Of Concrete 18 To 36 Inches |
| County: Pinellas |
| Deployed: 7/30/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| Area Covered 29' X 45', 11 Pieces |
| County: Pinellas |
| Deployed: 4/14/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| Area Covered 29' X 45', 13 Pieces |
| County: Pinellas |
| Deployed: 4/13/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| 54" And 48" Culverts |
| County: Pinellas |
| Deployed: 6/29/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| 29"x45" Ovals, Stuffed With 18"&15" Culverts, 17 Pieces |
| County: Pinellas |
| Deployed: 5/20/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| 14 Concrete Culverts From 15" To 54" |
| County: Pinellas |
| Deployed: 5/18/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| 29"x45" Ovals, Stuffed With 18"&15" Culverts, 30 Pieces |
| County: Pinellas |
| Deployed: 5/14/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater C Site |
| Area Covered 29' X 45', 13 Pieces |
| County: Pinellas |
| Deployed: 4/19/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater Reef |
| Concrete Sinkers, Near Sw Buoy, 50 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 12/7/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater Reef |
| Concrete Rubble, 496 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 8/19/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater Reef |
| 27 Tons Of Concrete Cutoff Poles |
| County: Pinellas |
| Deployed: 1/26/1998 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater Reef |
| Cement Cut Offs And 10 Foot Diameter Steel Pipes, 60 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 12/16/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater Reef |
| Concrete Pyramids, Airplane, Concrete Rubble & Barge |
| County: Pinellas |
| Deployed: 12/31/1974 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater Reef |
| Concrete Culverts, 496 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 8/25/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Clearwater Reef |
| Concrete Culverts, 1500 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 9/16/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 28 Pieces Of Culverts |
| County: Pinellas |
| Deployed: 12/24/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 12 Pieces Of Large Oval Culverts |
| County: Pinellas |
| Deployed: 10/1/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 18 Pieces Of Boxes And Assorted Concrete |
| County: Pinellas |
| Deployed: 1/5/1998 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 29 Pieces Of Concrete Culverts |
| County: Pinellas |
| Deployed: 12/24/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 23 Pieces Of Concrete Culverts |
| County: Pinellas |
| Deployed: 12/23/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 2nd Of 5 Loads This Grant & This Site, 3 Piles About 20 Feet Apart |
| County: Pinellas |
| Deployed: 5/7/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 3rd Of 5 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 5/16/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 1rst Of 5 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 5/1/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin |
| 5th Of 5 Loads This Grant This Site |
| County: Pinellas |
| Deployed: 6/20/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 33 Culverts & 1 Box |
| County: Pinellas |
| Deployed: 11/6/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 23 Pieces Of Concrete Culverts |
| County: Pinellas |
| Deployed: 12/8/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 37 Pieces Of Concrete Culverts |
| County: Pinellas |
| Deployed: 12/10/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 30 Pieces Of Concrete Flower Boxes From Courthouse |
| County: Pinellas |
| Deployed: 12/11/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 29 Pieces Of Concrete Flower Boxes From Courthouse |
| County: Pinellas |
| Deployed: 12/17/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 28 Pieces Of Culverts And Boxes |
| County: Pinellas |
| Deployed: 12/21/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 40 Small Pieces Of Concrete Culverts |
| County: Pinellas |
| Deployed: 11/3/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 14 Culverts And Boxes |
| County: Pinellas |
| Deployed: 10/30/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 15 Large Concrete Culverts |
| County: Pinellas |
| Deployed: 11/20/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 19 Large Oval Culverts |
| County: Pinellas |
| Deployed: 11/21/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 11 Large Pieces Of Culverts |
| County: Pinellas |
| Deployed: 10/27/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 20 Pieces Of Concrete Culverts |
| County: Pinellas |
| Deployed: 11/26/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 20 Culverts |
| County: Pinellas |
| Deployed: 11/9/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 38 Small Pieces Of Concrete Culverts |
| County: Pinellas |
| Deployed: 11/4/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin - J Site |
| 11 Large Pieces Of Culverts 12 Foot Long |
| County: Pinellas |
| Deployed: 10/29/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| Concrete Culverts, 744 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 8/23/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| Concrete Culvert & Pyramids |
| County: Pinellas |
| Deployed: 12/31/1975 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| Concrete Culverts, 750 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 8/24/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| Concrete Culverts, 496 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 8/25/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| 20.0 Yards. Of Rubble (2 Of 11 Loads) |
| County: Pinellas |
| Deployed: 11/19/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| 20.0 Yards. Of Rubble (1 Of 11 Loads) |
| County: Pinellas |
| Deployed: 11/13/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| 22 Pieces Of Concrete Culverts & Rubble |
| County: Pinellas |
| Deployed: 1/6/1998 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| 10.6 Yards. Of Rubble (3 Of 11 Loads) |
| County: Pinellas |
| Deployed: 11/20/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| 25.0 Yards. Of Rubble (5 Of 11 Loads) |
| County: Pinellas |
| Deployed: 11/26/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| 20 Tons Of 36" Culverts |
| County: Pinellas |
| Deployed: 1/7/1998 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef |
| Concrete Rubble |
| County: Pinellas |
| Deployed: 12/31/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Dunedin Reef Site 'j' |
| 12 Pieces Culverts Various Sizes |
| County: Pinellas |
| Deployed: 1/27/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Madeira Reef |
| Two Groups About 40 Feet Apart, 4th Of 4 Loads |
| County: Pinellas |
| Deployed: 7/25/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Madeira Reef |
| 3rd Of 4 Loads This Site |
| County: Pinellas |
| Deployed: 6/27/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Madeira Reef |
| 2nd Of 4 Loads This Site |
| County: Pinellas |
| Deployed: 6/26/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Madeira Reef |
| 1rst Of 4 Loads This Site |
| County: Pinellas |
| Deployed: 6/23/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Madeira Reef |
| 29 Loads From 11/09/82 To 04/21/83, 686 Yards. Total |
| County: Pinellas |
| Deployed: 3/15/1983 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (center) |
| 9 Pieces Of Concrete Culverts 42 & 48 Inch Sizes (ovals) |
| County: Pinellas |
| Deployed: 1/27/2000 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 13 Pieces Of Concrete Culverts 36 Inch Sizes |
| County: Pinellas |
| Deployed: 1/7/2000 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 7 Pieces Of Concrete Culverts 54 To 48 Inch Sizes |
| County: Pinellas |
| Deployed: 9/9/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 19 Pieces Of Concrete Culverts 18, 24 & 30 Inch Sizes |
| County: Pinellas |
| Deployed: 11/24/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 27 Pieces Of Concrete Culverts 18, 24 & 30 Inch Sizes (ovals) |
| County: Pinellas |
| Deployed: 11/29/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 18 Pieces Of Concrete Culverts 12, 18, 24 & 30 Inch Sizes |
| County: Pinellas |
| Deployed: 11/30/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 18 Pieces Of Concrete Culverts 18, 24 & 30 Inch Sizes (ovals) |
| County: Pinellas |
| Deployed: 12/3/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 18 Pieces Of Concrete Culverts 19 X 30 & 14 X 23 Inch Sizes (ovals) |
| County: Pinellas |
| Deployed: 12/6/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 20 Pieces Of Concrete Culverts 30 Inch Sizes |
| County: Pinellas |
| Deployed: 12/10/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 17 Pieces Of Concrete Culverts 30 Inch Sizes |
| County: Pinellas |
| Deployed: 12/13/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 23 Concrete Slabs, 27-47 X118 Inch-on Top Of Culverts |
| County: Pinellas |
| Deployed: 12/20/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 24 Concrete Slabs, 27-47 X118 Inch-on Top Of Culverts |
| County: Pinellas |
| Deployed: 12/21/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (ne)-a |
| 29 Pieces Of Concrete Culverts 18 Inch Sizes |
| County: Pinellas |
| Deployed: 12/22/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| North County Reef (nw) |
| Two N-w Rows Of Polygonals, 50 6-ft. & 50 4.5- Ft Tall, Nw Of Barges |
| County: Pinellas |
| Deployed: 8/17/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Pier-60 |
| Concrete Material Placed Around Pilings Off Pier 60 In Clearwater. |
| County: Pinellas |
| Deployed: 9/24/1986 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 20.0 Yards. Of Concrete Culverts (7 Of 11 Loads) |
| County: Pinellas |
| Deployed: 11/29/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| Cement Sinkers Placed In Scattered Units, 3 Feet Profile |
| County: Pinellas |
| Deployed: 7/3/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| Boat Molds And Culverts |
| County: Pinellas |
| Deployed: 7/10/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 21.0 Yards. Of Concrete Culverts (6 Of 11 Loads) |
| County: Pinellas |
| Deployed: 11/27/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 282 Culverts Next To Sand Key Bridge, 9 Loads, Began On 11/14/96 |
| County: Pinellas |
| Deployed: 12/12/1996 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 16.0 Yards. Of Concrete Culverts (8 Of 11 Loads) |
| County: Pinellas |
| Deployed: 12/10/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 20.0 Yards. Of Concrete Culverts (9 Of 11 Loads) |
| County: Pinellas |
| Deployed: 12/11/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 20.2 Yards. Of Concrete Culverts (10 Of 11 Loads) |
| County: Pinellas |
| Deployed: 12/12/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 21 Yd. Of Concrete Culvert (11th Of 11 Loads) |
| County: Pinellas |
| Deployed: 12/13/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn |
| 18.0 Yards. Of Concrete Culverts (4 Of 11 Loads) |
| County: Pinellas |
| Deployed: 11/21/1990 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn North |
| 16 Pieces Of Concrete 15 To 48 Inch Sizes |
| County: Pinellas |
| Deployed: 7/23/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn Reef |
| 431 Culverts Next To Sand Key Bridge, 16 Loads Began On 5/23/96 |
| County: Pinellas |
| Deployed: 11/7/1996 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn Reef |
| Concrete Culverts And Concrete Pilings. |
| County: Pinellas |
| Deployed: 4/4/1988 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn Reef |
| Concrete Culverts, 10 Yards, 100 Sq. Feet Coverage |
| County: Pinellas |
| Deployed: 9/20/1982 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn Reef |
| 26 Separate Loads Of Concrete |
| County: Pinellas |
| Deployed: 4/3/1989 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn Reef - Zone F |
| 173 Culverts In Sub Zone "f", Seven Loads, Began On 2/12/96 |
| County: Pinellas |
| Deployed: 2/21/1996 |
| Type: Concrete Rubble |
 |
 |
 |
| Rube Allyn Reef - Zone F |
| 67 Large Concrete Pieces, Sub Zone "f", One Load |
| County: Pinellas |
| Deployed: 1/30/1996 |
| Type: Concrete Rubble |
 |
 |
 |
| St. Pete Beach Site |
| 3 Loads From 3/7/83 To 4/6/83, Three Other Sites, Same Grant |
| County: Pinellas |
| Deployed: 4/6/1983 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 8th Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 7/8/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 2nd Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 6/3/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 4th Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 6/10/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 5th Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 6/12/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 7th Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 7/1/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 3rd Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 6/6/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| Concrete Culverts And Pyramids |
| County: Pinellas |
| Deployed: 12/31/1987 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 1rst Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 4/24/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Tarpon Springs Reef |
| 6th Of 8 Loads This Grant & This Site |
| County: Pinellas |
| Deployed: 6/24/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Treasure Island |
| New Area, Will Monitor Progress, 1rst Of 3 Loads This Site |
| County: Pinellas |
| Deployed: 5/6/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Treasure Island |
| New Area, Will Monitor Progress, 3rd Of 3 Loads This Site |
| County: Pinellas |
| Deployed: 6/17/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Treasure Island |
| New Area, Will Monitor Progress, 2nd Of 3 Loads This Site |
| County: Pinellas |
| Deployed: 6/5/1985 |
| Type: Concrete Rubble |
 |
 |
 |
| Treasure Island Reef |
| Concrete Pilings, Pyramids And Rubble |
| County: Pinellas |
| Deployed: 12/31/1975 |
| Type: Concrete Rubble |
 |
 |
 |
| Veterans Reef |
| 18 Pieces Of Oval Culverts, 18" X 36" And 12" X 18" |
| County: Pinellas |
| Deployed: 9/21/2000 |
| Type: Concrete Rubble |
 |
 |
 |
| Veterans Reef |
| Various Sizes Of Culverts |
| County: Pinellas |
| Deployed: 9/12/2000 |
| Type: Concrete Rubble |
 |
 |
 |
| Veterans Reef |
| 17 Poles And 2 Boxes |
| County: Pinellas |
| Deployed: 8/18/2000 |
| Type: Concrete Rubble |
 |
 |
 |
| Veterans Reef |
| 20 Pieces Of Culvert On Top Of Single Aircraft Wing |
| County: Pinellas |
| Deployed: 10/5/2000 |
| Type: Concrete Rubble |
 |
 |
 |
| Pinellas Ii -sheridan |
| 180 Foot Tugboat The "d.t. Sheridan" |
| County: Pinellas |
| Deployed: 12/31/1975 |
| Type: Wreck |
|
 |
 |
| Veterans Reef |
| 1 Large, 1 Small Steel Cargo Boxes With 4 Pieces 24" X 4' Culvert |
| |
| Classification: Steel Scrap |
| Material: Steel Containers |
| |
| County: Pinellas |
| Deployed: 1/17/2000 |
| Depth: 44 |
| Relief: 8 |
 |
| Coordinates |
 |
| Latitude: 28.02636 |
| Longitude: -83.00754 |
| View Chart |
|
|
 |
 |
|